Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.8538831

- Product Categories
- Friendly Links
Information Name: | Hydraulic pile driver folder |
Published: | 2011-10-06 |
Validity: | 30 |
Specifications: | |
Quantity: | 1.00 |
Price Description: | |
Detailed Product Description: | Hydraulic pile driver folder As the need for construction, there are often 1-2 meters above the ground the foundation pile head, in order to carry out construction projects, must be broken pile head, hydraulic pile driver folder to quickly and accurately in a crush at the same time ensure the reinforcement of foundation pile head integrity, greatly improve the follow-up work and the efficiency of the pile. Hydraulic pile driver from the folder of each module is connected, this device can be closer to round or square foundations. And because the special clip design of the pile driver can be very easy to increase or decrease the module components in order to obtain the best combination of size. Round size range :350-1600 mm. Square size range is 350-800 mm. East Air hydraulic pile driver can be installed folder in a variety of carriers (such as excavators, cranes, etc.), and these vectors are used in conjunction with the special line provided by us directly. East Air Hydraulic pile driver according to the foundation piles folder different size and shape to provide the corresponding hammer, so to meet the needs of different conditions. 750mm-1800mm diameter circular pile - heavyweight Broken pile diameter (mm) +10 mm 750-800 850 900 900-950 1000 1050 1100-1150 1200 1250 1250-1300 1350 1400 1450 1500 1500 -1600 1550-1700 1750 1800 Adaptation excavator weight (t) 20-25 20-25 25-30 25-30 30-35 30-35 Component link way 8P 8P 8P 9P 9P 9P 10P 10P 10P 11P 11P 11P 12HP 12HP 12HP 13HP 13HP 13HP Hammerhead type long in length in the short short short long long short long of short length in the short Folder Pile Weight (kg) 2000 2250 2500 3100 3380 3665 Hydraulic pressure (bar) 320-350 320-350 320-350 320-350 320-350 320-350 Flow (l / min) 200 225 250 275 300 325 Diameter (mm) 2185 2375 2560 2750 3230 3420 Above are subject to change without notice Diameter of 300mm-800mm square piles Broken pile diameter (mm) +10 mm 350-400 450 500 500-550 600 650 650-700 750 800 Adaptation excavator weight (T) 10-15 10-15 15-20 Component link way 4L +4 B 4L +4 B 4L +4 B 4D +4 E 4D +4 E 4D +4 E 4D +4 B 4D +4 B 4D +4 B Hammerhead type long in the short short long short long in Folder Pile Weight (kg) 800 1000 1100 Hydraulic pressure (bar) 320-350 320-350 320-350 Flow (l / min) 100 200 200 Diameter (mm) 1775 1950 2100 Above are subject to change without notice 350mm-750mm diameter circular pile - Lightweight Broken pile diameter (mm) +10 mm 350 400 450 500 550 600 650 700 750 Adaptation excavator weight (t) 10-15 10-15 15-20 Component link way 6L 6L 6L 7L 7L 7L 8L 8L 8L Hammerhead type long in the short short long short long in Folder Pile Weight (kg) 1000 1160 1330 Hydraulic pressure (bar) 320-350 320-350 320-350 Flow (l / min) 150 175 200 Diameter (mm) 1700 1900 2050 Above are subject to change without notice Contact: Lu college 13,475,792,219 Website http://lvgaoxiao.b2b.youboy.com/ Contact: Lu University (Sales Manager) Tel: 0537-2351538 13475792219 QQ: 2421725592 Want zhongmei03014 E-mail: lvgaoxiao03014@163.com Address: Torch Hi-tech Zone, Jining City Road East northbound S |
Admin>>>
You are the 19058 visitor
Copyright © GuangDong ICP No. 10089450, Building Materials Equipment Co., Ltd. Shandong coal All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 19058 visitor
Copyright © GuangDong ICP No. 10089450, Building Materials Equipment Co., Ltd. Shandong coal All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility